Project Description: Background
Major capital facilities construction project are currently underway at two Fraser Health Authority (FHA) hospital sites: the \xe2\x80\x98Health Care Pavilion\xe2\x80\x99 at Burnaby Hospital (BH); and the \xe2\x80\x98Jim Pattison Acute Care Tower\xe2\x80\x99 (JPACT) at Royal Columbian Hospital (RCH). Target completion is set for mid-2025 and late-2025, respectively.
Both construction projects will provide for much larger spaces for clinical service delivery, relative to what is currently available. While these larger spaces will improve clinical services in many ways, they also introduce one key drawback which is that they make it much more difficult for clinical staff to communicate with each other and to exchange information. This has the potential to adversely affect the delivery of safe and effective clinical care.
\xe2\x80\x98Unified Clinical Communications\xe2\x80\x99 (UCC) technologies are planned to mitigate this risk. For background, UCC is a term used in Fraser Health to refer to a family of commercial communications technologies designed to facilitate communications in clinical settings. An important example of a technology that falls under the UCC umbrella is \xe2\x80\x98Vocera\xe2\x80\x99.
At present, Vocera has been deployed to several clinical departments at RCH and will be extended to the JPACT so that it is broadly available across the site on opening day. At BH, Vocera has so far been deployed to one clinical department at BH, but plans are being developed to expand it to other departments in support of the construction project. Expansion of Vocera systems at BH and RCH is a key objective of this SOW.Project Overview
UCC projects are technically complex and therefore challenging to implement.
Much of this complexity results from the wide-ranging assortment of technical infrastructure components needed to support even basic UCC use cases, extending from data center-based servers and storage, to wired and wireless networks, to application software, and to the end use devices themselves.
For UCC applications to provide the quality of service necessary, each component must be configured to operate in an optimal fashion \xe2\x80\x93 both by itself, and with its neighboring components in the overall UCC technical environment. Achieving an optimal configuration is a complex challenge on its own.
As well, complexity also emerges when UCC systems are integrated with other technical environments, as described in the following two examples:
Nurse Call Integration: Interoperability with the Nurse Call system will contribute to enhanced clinical workflow by, for example, enabling the ability to route patient calls for assistance to the clinical staff member assigned to that patient
2. Clinical Patient Monitors: Interoperability with clinical patient monitors will enable the ability to alert clinical staff about adverse patient events while they are not at the bedside.
This Statement of Work (SOW) requests the services of a \xe2\x80\x98Technical Solution Lead\xe2\x80\x99 to lead the technical work for UCC projects at RCH and BH. These services will extend across the full project lifecycle, extending from solution design, to implementation, to testing, optimization and deployment.
The scope will involve both the activities needed to enable basic UCC functionality \xe2\x80\x93 deployment and optimization of Vocera in a specific clinical department, for example \xe2\x80\x93 as well as interoperability extensions to other systems, such as the Nurse Call system described above.
Note that this Statement of Work is not specifically limited to the UCC projects described above. In order to achieve full efficiency and utilization, the scope of this engagement may be extended to other UCC-related projects as well as to projects that do not fall under the UCC umbrella.
Also note that while this Statement of Work primarily involves redevelopment projects at BH and RCH, the engagement may be extended to other initiatives in FHA such as, for example, the new hospital being constructed in Surrey, informally referred to as the \xe2\x80\x98New Surrey Hospital and BC Cancer Center\xe2\x80\x99 (NSHBCCC).Services Required:
Assume the \xe2\x80\x98Technical Lead\xe2\x80\x99 role for UCC projects at BH and RCH. This role is further described as follows: * Serve as the point of contact for technical matters related to the UCC project.