Manitoba Hydro is consistently recognized as one of Manitoba's Top Employers!
Great Benefits
Competitive salary and benefits package.
Defined-benefit pension plan.
Nine-day work cycle which normally results in every other Monday off, providing for a balanced approach to work, family life
and community.
Flex-time and partially remote work schedule (providing the option to work remotely 3 days per 2 week period), depending on
nature of work, operational requirements and work location.
Manitoba Hydro is a leader among energy companies in North America, recognized for providing highly reliable service and
exceptional customer satisfaction. Join our team of Manitoba's best as we continue to build a company that supports innovation,
commitment, and customer service, while actively supporting a diverse, equitable and inclusive workplace.
We are seeking a permanent Transmission Capability & System Studies Engineer to join our System Performance Department in
Winnipeg, Manitoba.
Responsibilities:
Develop, implement and maintain Manitoba Hydro's transmission capability posting methodology. This would include but not
be limited to:
Maintenance of Manitoba Hydro's Available Transmission Capability Implementation Document (ATCID).
Development and maintenance of Manitoba Hydro's Book of Flowgates.
Monitoring of Flowgate uses using tools such as Parallel Flow Visualization (PFV) and Transmission Loading Relief (TLR).
Comparing Posting Methodologies with other utilities in the Eastern Interconnection to develop best practices.
Participate in seams coordination with MISO and other tie line partners.
Update posting methodology and philosophy to comply with various government directives.
Periodically evaluate tools used for congestion management to ensure Manitoba Hydro's system and generation priorities
are properly modelled. Perform load flow and transient stability, or other power system studies, to determine and recommend the power transfer
limits of existing and proposed interconnections with neighbouring utilities. Assist in the formulation of, and recommendations for, operating guidelines defining interchange limits within the Manitoba
system. Develop, prepare, and performs or directs staff to issue dispatcher daily power flow, temporary operating instructions, and
contingency plans to System Control Staff for each operating day to System Control staff, MISO Reliability Coordinator and
neighbouring Balancing Authorities and Transmission Operators (IESO, SPC, MPC). This position requires working the
occasional Hydro Monday with time off in lieu of. Participate in the review and comment on proposed electrical system expansion plans with the view that system operating
requirements are satisfied. Participate as required on inter-utility study task forces and committees concerned with defining interconnection power
transfer limits. Prepare formal reports and technical memorandums.
Participate in the standby rotation providing off-hours support to the control room as needed.
Contribute to the development of Seasonal and Temporary Operating Guidelines, and Operating Guidelines for System
Control Centre.
Collaborate with other INP engineers to ensure consistency and integration across all operational studies and planning efforts.
Qualifications:
MANITOBA HYDRO IS COMMITTED TO DIVERSITY AND EMPLOYMENT EQUITY
Reference Code: CO57110280-01
Graduate in Electrical Engineering from a university of recognized standing with a minimum of six years of related experience
in power system analysis. Professional member in good standing with Engineers Geoscientists Manitoba (or willingness and ability to attain within a
specified amount of time). Demonstrated ability to analyze and effectively solve complex problems.
Demonstrated ability to effectively use computer programs intended for power system simulation.
Demonstrated ability to develop computer models to analyze power systems.
Knowledge of transmission system congestion management would be an asset.
Knowledge of extra provincial transmission operation would be an asset.
Post graduate degree or graduate courses related to power systems would be an asset.
Must possess a valid Province of Manitoba driver's licence.
Salary Range
Starting salary will be commensurate with qualifications and experience. The range for the classification is $47.32-$65.33 Hourly,
$90,677.86-$125,192.08 Annually.
Apply Now!
Visit www.hydro.mb.ca/careers to learn more about this position and to apply online.
The deadline for applications is
OCTOBER 20,2025.
We thank you for your interest and will contact you if you are selected for an interview.
This document is available in accessible formats upon request. Please let us know if you require any accommodations
during the recruitment process.
#IND1
Beware of fraud agents! do not pay money to get a job
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.